4. Chelyabinsk region, Suroyam river — 2016
Technical design for development of the first stage of the Suroyamskoye titanium-magnetite ore deposit.
6. Kemerovo region, 60 km from Mezhdurechensk — 2014
Technological consulting on preparation of EPC-contract.
7. Republic of Khakassia, Tuim — 2014
Technological consulting on preparation of EPC-contract for construction of electrolytic manganese production plant.
9. Sheregeshsky mine, Kemerovo Oblast. — 2014-2023
Pilot scale test projects, adjustment of the technical design, underground mine technical upgrade projects, designer's supervision.
10. Kazskoye deposit, Kemerovo Region — 2021-2023
Underground mine at Kazskoye deposit. Basic design solutions. Technical re-equipment project.
12. Abakanskiy mine, Republic of Khakassia, Abaza city — 2017-2023
Project for technical re-equipment of the underground mine, underground mine ventilation project, R&D, Pilot scale tests and basic design solutions for mine water treatment, R&D, Pilot scale tests and basic design solutions for upgrading of the ore dressing plant.
13. Kolskaya MMC, Monchegorsk, Murmansk region — 2017
Detail design documentation for reconstruction, technical re-equipment project of the nickel electrolysis shop.
14. Kolskaya MMC, Zapolyarny city, Murmansk region — 2018
Ventilation model of an underground mine and technique for calculating the required air amount. Model of underground mine ventilation and methodology for calculating the required amount of air.
15. Magnezit Combine, Satka, Chelyabinsk region. — 2017-2018
Technical re-equipment projects: crushing section, grinding, pressing and molding sections, electric furnace loading unit.
16. Technical re-equipment projects: crushing section, grinding, pressing and molding sections, electric furnace loading unit 2019
Basic engineering and pre-project proposals for the construction of a complex for EAF metallurgical dusts processing with production of granulated pig iron and zinc oxide concentrate.
17. Construction Material Plant, Bogdanovich, Sverdlovsk region — 2018-2019
Projects of crushing and screening plant and primary limestone processing line.
20. "Mantrak Vostok", Ekaterinburg, Koltsovsky highway — 2021
Design and detailed design documentation for the construction of a complex of buildings, structures and facilities of the dealership center of Mantrak-Vostok LLC with obtaining a construction permit.
22. Safyanovskaya Med, JSC, Rezh, Sverdlovsk region — 2021
Development of working documentation for construction of a unit for production of crushed stone and other products from rock overburden of Safyanovskoye deposit.
23. Tyumennerud LLC, Andreevskoye lake, Borovsky settlement. — 2022
Development project of the construction sands deposit "Andreevskoye lake", reclamation project.
24. RUSAL Ural, JSC, Kamensk-Uralsky, Sverdlovsk region — 2022
Technical re-equipment of section No. 1 of the raw material preparation shop of the arch skull furnace. B-3/55 dedusting unit replacement.
25. EVRAZ-NTMK, Nizhny Tagil — 2022
Detailed design documentation. Drainage and surface water treatment system from the slag dump of the Blast Furnace Shop.
26. "Sinida-1" co-operative association of prospectors, LLC, Buryatia — 2022
Ventilation of the underground mine at the Nerundinskoye gold deposit. Technical re-equipment.
27. EVRAZ ZSMK JSC, Novokuznetsk, Kemerovo region — 2021-2023
Development of basic design solutions for modernization and technical re-equipment of Abagurskaya Concentrating Plant
28. Chernorechensk settlement, Sverdlovsk region — 2022
Project of geological exploration works.
29. Guryevsky district, Kemerovo region — 2023
Justification of enrichment technology (gold recovery).
30. Guryevsky district, Kemerovo region — 2022
Mining project of Malosalairskoye fluxing limestone deposit.
31. Kaslinsky district, Chelyabinsk region — 2022
Technological tests ( tungsten ore dressing) of the Severo-Porokhovsky site and Yugo-Konevskoye deposit.
32. Guryevsky district, Kemerovo region — 2022
Justification of technology of enrichment (processing) of gold-bearing ore. Feasibility study development of temporary exploration conditions.
33. Uchalinsky GOK JSC, Uchaly, Bashkortostan — 2021-2023
Design and detailed design documentation, technical re-equipment, Basic design solutions. Various local facilities of the Mining and Processing Combine.
34. Teplaya Gora settlement, Perm region — 2023
РазраDevelopment of detailed design documentation for reconstruction of Teplogorsky crushed stone plant.ботка рабочей документации на реконструкцию Теплогорского щебеночного завода.
35. Sukhoi Log, Sverdlovsk region. Fevralskoye gold deposit — 2022-2023
Study of material composition and technological ore properties of the Fevralskoye and Ikryanskoye sites.