environmental design (SPZ, EIA, reclamation project)
special sections of the project (labor organization, production management, engineering and technical measures for civil defense and emergency prevention, fire extinguishing systems, construction organization, etc.).
We carry out integrated design on a "turnkey" basis, at all stages and in all required sections, guaranteeing and accompanying the undergoing of all kinds of established expert reviews
open pit mining of deposits
underground mining of deposits
separate mining and mechanical units of mining and ore dressing production
pelletizing of raw materials (pelletizing plants, sintering plants, briquetting plants)
coke and chemical production
hydrometallurgical production
in-situ and heap leaching sites
technologies for opening and mining of deposits by open pit and underground methods
geological and information support of mining production
drilling and blasting parameters
hydraulic engineering structures
architectural and construction solutions for industrial and civil construction
engineering support of mining production, water, heat and gas supply, power supply and lighting, communications and signaling, complex mechanization and technological transport, ventilation, automation of production processes and automated control systems
water treatment, water rotation and wastewater disposal systems
sinter and blast furnace production